Layout: keep or change
State whether fixtures stay in place or move. Relocating the toilet, shower or basin changes plumbing scope significantly, so proposals must share this assumption.
Bathroom renovation planner
Decide what moves and what stays, understand the waterproofing, licensing and asbestos questions for your home, then compare itemised proposals against the same brief.
A request may be sent to up to three eligible suppliers, subject to service-area and supplier availability. Supplier availability and quote outcomes vary.
Browse location pages for major Australian cities. Supplier coverage and availability vary by area.
Select your nearest city to compare local suppliers, suburb coverage and quote options.
Submit your project details once. We look for eligible local suppliers; availability and response times vary.
Up to 3
Supplier matches
Eligible suppliers are selected by service, area and current availability
Every one
ABN-checked suppliers
Suppliers are ABN-checked and manually reviewed before receiving leads
$0
Free for homeowners
No payment and no obligation to hire
No obligation
You decide
Compare any responses and choose whether to proceed
Before requesting proposals
Your brief defines the request; it does not establish feasibility, approvals or structural options. Builders may still need to inspect the home before confirming scope.
State whether fixtures stay in place or move. Relocating the toilet, shower or basin changes plumbing scope significantly, so proposals must share this assumption.
Photograph the room, note the approximate age of the home, known leaks or mould, and gather any strata by-laws or previous approval paperwork you hold.
List what you have in mind for tiling extent, shower or bath, vanity, tapware and accessibility needs - and separate must-haves from nice-to-haves.
Note whether this is the only bathroom, access for trades and materials, and how you plan to live during the work. Discuss it during quoting so assumptions match.
Property-specific checks
Waterproofing, licensing, asbestos, strata and contract questions belong in the brief before a start date is agreed.
Wet-area waterproofing has compliance requirements that vary by jurisdiction. Ask who performs it, who certifies it and what documentation you receive.
Plumbing, drainage and electrical work must be performed by licensed trades, with licensing state and territory based. Ask who performs each part and check the register.
Bathrooms in homes built or renovated before 1990 can contain asbestos in wall sheeting, tile underlays and floors. Do not cut, drill or strip suspect material; assess before demolition.
Whether approval is needed depends on the scope, the property and its controls - and strata approval is often required for waterproofing-affecting work in units. Check before booking.
Ask how the renovated room is ventilated and whether existing extraction complies for the new layout.
Home building contracts, deposits and staged payments are regulated differently by state and territory. Check the rules for your jurisdiction before signing or paying.
Scope and delivery
Two proposals for the same room can describe very different projects. These questions surface the differences before you compare totals.
Ask which trades attend, who coordinates them, who supervises quality and how long the room is expected to be out of action - as a plan, not a promise.
Ask which parts of the price are fixed and which are allowances for tiles, fixtures and tapware, and by when selections are needed.
Ask what strip-out is included, how suspect materials are handled, and where waste goes.
Ask what the proposal assumes about the condition of framing, plumbing and substrates - and how hidden findings are priced when opened up.
Compare like with like
A total is only comparable when the waterproofing, trades, allowances and payment terms behind it are visible.
The layout the price is based on, what moves and what stays, and assumptions that still need confirmation.
Who waterproofs, to what standard it is certified in your jurisdiction, and the documentation you receive.
The plumbing and electrical work included, who performs it, and the compliance certificates issued.
What is supplied and installed, what is by others, and every allowance with its amount.
Protection of the home, dust and waste handling, amenities during the work and working hours.
The payment schedule against stages, the written variation process, warranty responsibilities and defect handling.
Provider due diligence
Marketplace eligibility is not proof of a licence, insurance policy or waterproofing capability for your project. Verify the evidence that matters before hiring.
Confirm the contracting entity and ABN, then check the licence requirements for bathroom renovation work in your state or territory.
Ask what insurance applies, including any home building compensation requirements in your jurisdiction, and request current evidence.
Ask for recent bathroom projects comparable to yours, ideally with owners you can speak to.
Ask specifically who stands behind the waterproofing and what happens if it fails.
Require scope, selection and price changes to be agreed in writing before work proceeds.
Agree what certificates and documentation you receive and how post-completion defects are handled.
Requesting supplier matches is free and does not obligate you to hire.
Share details about your bathroom renovation needs using the request form.
We look for up to 3 eligible bathroom renovation contractors based on service fit, coverage and current availability.
Compare any responses you receive, including scope, price, timing and supplier terms. You decide whether to proceed.
Authority directory
Each source has a stated role and limit. Use the council, consumer body and licence register relevant to the property and proposed work.
NSW Government
A New South Wales starting point covering approvals, contracts, licensing checks and consumer protections for home building work.
Limit: New South Wales only. Other states and territories have different legislation, thresholds and consumer bodies.
Open source page (opens in a new tab)Asbestos and Silica Safety and Eradication Agency
Australian Government guidance on asbestos in homes built or renovated before 1990, including wet-area wall sheeting and flooring.
Limit: Identification requires testing. State and territory rules govern assessment and removal; this page does not replace a licensed assessment.
Open source page (opens in a new tab)NSW Government
The NSW portal for checking licence and registration information for building, plumbing and electrical trades.
Limit: New South Wales only. Licence classes and registers differ in other states and territories.
Open source page (opens in a new tab)
Requesting quotes is free for homeowners, and a request may be sent to up to three eligible suppliers, subject to service-area and supplier availability. Share the layout intent, fixtures in mind and any known approval or asbestos questions. Renovators may still need to inspect the room before proposing a scope.
Clear answers to the questions homeowners usually ask before comparing quotes.
Free guides to help you plan, budget and compare a bathroom renovation
Cost structure and pricing factors for bathroom renovations
Read guide
Step-by-step planning questions for a bathroom project
Read guide
How to prioritise renovation projects against budget and disruption
Read guide
How approval pathways work and when renovations need consent
Read guideCompare related quotes for broader renovations, kitchens and separate safety scopes.
Bundle the bathroom with broader renovation planning.
Compare quotes for a dedicated kitchen project.
Assess and remove suspect materials as a separate licensed scope.
Plan strip-out as its own scope where needed.
For bathroom renovators and wet area renovation specialists
Prepaid credits at $90 per verified lead - no subscriptions, no lock-in contracts. Set your service areas and daily limits, and only pay for the leads you receive.
Planning a bathroom renovation?
Planning a bathroom renovation?
Get up to 3 free bathroom renovation quotes, subject to supplier availability