Bathroom Renovation Checklist Australia Complete Planning Guide: Step-by-Step Checklist, AS 3740 Waterproofing, Timeline Planning

What do you need to know before renovating a bathroom in Australia? Complete checklist with step-by-step planning, what drives costs, waterproofing requirements, and design considerations.

The Wombat Team
Guide

General information for Australian homeowners - not professional, legal or safety advice. Requirements vary by state and territory. How these guides are written

Bathroom Renovation Checklist Australia complete planning guide image
Quick Answer 5 min read

Complete Bathroom Renovation Checklist

A successful bathroom renovation follows four key phases: Pre-Renovation (2-4 weeks planning, permits, design, quotes), Demolition Phase (3-5 days demo, waterproofing prep, asbestos check), Installation Phase (2-3 weeks tiling, plumbing, electrical, fixtures), and Finishing Touches (3-5 days painting, sealing, final inspection). Total timeline: typically 3-5 weeks. Critical checkpoints: AS 3740 waterproofing certification, licensed tradies for all plumbing/electrical, final inspection before handover.

Checklist Overview

Get 3-5 detailed quotes from licensed contractors. Check permits required (council/strata). Finalize design, fixtures, tile selections. Plan temporary bathroom access. Remove old fixtures, tiles, vanity safely. Check for asbestos (pre-1990s homes). Dispose of waste at licensed facility. Prepare substrate for waterproofing. Waterproofing + AS 3740 certification. Floor + wall tiling (7-10 days cure time). Plumbing rough-in, electrical, ventilation. Install vanity, toilet, shower, fixtures. Grout sealing (wait 48-72 hours cure). Painting, mirror, accessories installation. Final inspection + waterproofing sign-off. Deep clean before handover

Critical Success Factors

Never skip waterproofing certification - it's legally required in Australia. AS 3740 compliance prevents expensive water damage repairs. Only hire licensed plumbers and electricians (check licences with your state licensing body). Allow 48-72 hours cure time for tiles before grouting. Test all fixtures before final sign-off. Keeping the existing plumbing layout avoids new plumbing runs, one of the larger line items. Add 15% contingency for hidden issues (common in pre-1990s homes).

Quote check

Compare itemised quotes for materials, labour, access, warranties and exclusions.

Local factors

Final pricing can vary by location, site access, compliance requirements and supplier availability.

Bathroom Renovation Scope by Size: Small, Medium and Large Bathrooms Australia

Pricing varies widely by location, access and materials, so we describe each tier by scope and inclusions rather than a dollar range. Use the tiers to brief renovators, then compare itemised quotes for your bathroom.

Small Bathroom (3-4sqm)

Ensuite or powder room • Basic fixtures • Standard finishes

Budget Refresh

Cosmetic update scope

  • • Paint & new fixtures
  • • Budget tiles/vinyl
  • • Basic vanity & mirror
  • • Standard toilet & taps
  • • Typically 1-2 weeks on site

Standard Renovation

Full strip-out scope

  • • Full retile & waterproofing
  • • Mid-range tiles
  • • Quality vanity & storage
  • • New shower screen
  • • Typically 2-3 weeks on site

Premium Quality

Designer finish scope

  • • Designer tiles & finishes
  • • Premium fixtures & fittings
  • • Custom vanity & storage
  • • Heated towel rail
  • • Typically 3-4 weeks on site

Medium Bathroom (5-7sqm)

Main family bathroom • Bath & shower • Full storage

Budget Refresh

Cosmetic update scope

  • • Cosmetic updates only
  • • Budget materials
  • • Off-the-shelf vanity
  • • Basic fixtures
  • • Typically 2-3 weeks on site

Standard Renovation

Complete renovation scope

  • • Complete renovation
  • • Quality tiles & fixtures
  • • Semi-custom vanity
  • • Separate bath & shower
  • • Typically 3-4 weeks on site

Premium Quality

Luxury finish scope

  • • Luxury finishes
  • • Premium tiles & stone
  • • Custom cabinetry
  • • High-end fixtures
  • • Typically 4-6 weeks on site

Large Bathroom (8sqm+)

Master ensuite • Luxury features • Custom design

Standard Renovation

Complete renovation scope

  • • Quality finishes
  • • Standard fixtures
  • • Walk-in shower
  • • Double vanity option
  • • Typically 4-5 weeks on site

Premium Quality

Designer finish scope

  • • Designer finishes
  • • Premium fixtures
  • • Custom cabinetry
  • • Underfloor heating
  • • Typically 5-6 weeks on site

Luxury Custom

Fully custom scope

  • • Luxury stone & tiles
  • • High-end European fixtures
  • • Full custom design
  • • Smart features & automation
  • • Typically 6-8 weeks on site

Biggest Cost Drivers: Labour, Fixtures, Tiles and Waterproofing Australia

These are usually the biggest cost drivers in a bathroom renovation, roughly from largest to smallest. Ask every renovator to itemise them so you can compare quotes like for like:

  • 1. Tiling & waterproofing - usually the largest line item; driven by wall and floor area, tile choice and substrate condition
  • 2. Vanity & cabinetry - off-the-shelf vs semi-custom vs full custom is one of the biggest swings in any quote
  • 3. Fixtures (toilet, taps, shower) - fixture grade varies enormously; lock in exact models before comparing quotes
  • 4. Plumbing work - grows quickly if the layout changes or fixtures move; keeping the existing layout keeps this down
  • 5. Electrical & lighting - new circuits, IP-rated lighting, exhaust fans and heated towel rails all add up
  • 6. Demolition & waste removal - higher for older homes, difficult access or asbestos-era materials
  • 7. Painting & finishing - the smallest share, and a common DIY saving

Step-by-Step Planning Timeline: From First Quote to Handover Australia

Phase 1: Planning (2-4 weeks before)

  • Set budget: Determine total spend including 10-15% contingency
  • Measure space: Create accurate floor plan with all measurements
  • Research & inspiration: Collect design ideas, Pinterest boards, colour schemes
  • Get 3+ quotes: Compare licensed bathroom renovators
  • Check compliance: Confirm if council approval needed (rare for bathrooms)

Phase 2: Selection (2-3 weeks before)

  • Choose tiles: Wall tiles, floor tiles, grout colour (order 10% extra)
  • Select vanity: Size, style, storage, basin type (undermount/vessel)
  • Choose fixtures: Toilet, taps, shower head, shower screen, accessories
  • Select lighting: Downlights, vanity lights, exhaust fan (all IP rated)
  • Confirm waterproofing: Ensure licenced waterproofer booked

Phase 3: Pre-Construction (1 week before)

  • Arrange alternative bathroom: Set up temporary facilities
  • Clear bathroom: Remove all items, medicine cabinet, accessories
  • Protect access paths: Cover floors/stairs from bathroom to street
  • Confirm delivery dates: Ensure all materials arrive before/during reno
  • Final contractor meeting: Confirm timeline, scope, payment schedule

Phase 4: Construction (typically 3-6 weeks)

  • Week 1: Demolition, plumbing rough-in, electrical rough-in
  • Week 2: Waterproofing (requires 7-day cure + certification)
  • Week 3-4: Tiling walls and floors, grout, seal
  • Week 4-5: Install vanity, fixtures, shower screen, accessories
  • Week 5-6: Painting, final electrical/plumbing, clean, handover

Essential Design Considerations: Ventilation, Lighting, Storage, Accessibility Australia

Layout & Space Planning

Minimum clearances: 600mm in front of toilet/basin, 900mm shower opening
Door swing: Consider outward opening or sliding doors for small spaces
Storage planning: Include recessed niches, wall cabinets, vanity drawers
Future accessibility: Consider grab rail positions, curbless shower option
Keep plumbing location: Moving the toilet or basin means new plumbing runs, one of the larger line items

Fixture Selection Guide

Toilet: Back-to-wall (simpler install) vs wall-hung (premium look, more installation work)
Basin: Undermount (easiest clean) vs vessel (statement piece)
Shower: Standard 900mm screen vs walk-in (larger footprint, more tiling and glass)
Tapware: Chrome (cheapest) vs brushed brass/black (trending, priced above chrome)
WELS rating: Choose 4+ star fixtures for water efficiency

Tiles & Material Selection

Floor tiles: Must be slip-resistant (R10+ rating for wet areas)
Wall tiles: Large format (600x300mm+) = less grout, modern look
Natural stone: Requires sealing every 1-2 years, shows water marks
Porcelain vs ceramic: Porcelain is denser, more water-resistant, priced above ceramic
Grout colour: Lighter grout shows more dirt, charcoal/grey most practical

Lighting & Ventilation

IP rating required: IP44+ for bathroom, IP65+ for shower zone
Layered lighting: Downlights + vanity lights + feature/mirror lighting
Exhaust fan size: Minimum 25L/s extraction, bigger for bathrooms 8sqm+
Ducting: Must vent directly outside, not into roof cavity (causes mould)
Timer switch: Keeps fan running 10-15 mins after light off (inexpensive upgrade)

Waterproofing Requirements AS 3740: Mandatory Compliance Standards Australia

Why Waterproofing is Non-Negotiable

Waterproofing is legally required by Australian building codes and must be certified by a licensed professional. Poor waterproofing is one of the leading causes of bathroom failures, leading to water damage, structural rot, and mould that is expensive to rectify.

Areas Requiring Waterproofing

  • Shower area: Full height (minimum 1800mm) on all walls, full floor
  • Bath area: 150mm above bath edge on walls, 100mm beyond bath footprint
  • Basin area: 100mm behind basin, 150mm around basin on walls
  • Entire floor: Must be fully waterproofed including under toilet
  • Penetrations: All pipes, drains, fixtures must be sealed with bands

Waterproofing Process & Timeline

  • 1. Surface prep: Clean, level substrate (cement sheet/concrete)
  • 2. Membrane application: 2-3 coats liquid membrane or sheet membrane
  • 3. Reinforcing: Fabric tape on all joints, corners, penetrations
  • 4. Curing time: 7 days minimum before tiling (critical - do not rush)
  • 5. Certification: Licensed waterproofer issues compliance certificate

Warning: DIY Waterproofing is Illegal & Risky

In most Australian states, waterproofing must be completed by a licensed waterproofer and certified. DIY waterproofing voids insurance, fails building inspections, and costs significantly more to fix when it inevitably leaks.

Money-Saving Strategies for Bathroom Renovations Australia

Smart Savings (Maintain Quality)

  • Keep existing layout: Avoiding new plumbing runs cuts one of the larger line items
  • Off-the-shelf vanity: Custom cabinetry costs significantly more
  • Large format tiles: Faster install = lower labour costs
  • Mix materials: Use expensive tile as feature wall only
  • Standard shower screen: Custom screens cost significantly more than standard sizes
  • Time renovations right: Winter has more availability, better quotes

Risky Savings (May Cost More Long-Term)

  • Unlicensed tradies: No insurance, no warranty, illegal waterproofing
  • Cheapest materials: Budget tiles crack, cheap tapware leaks
  • Skipping exhaust fan: Leads to mould and moisture damage
  • DIY plumbing/electrical: Illegal, dangerous, voids insurance
  • Rushing waterproofing: Not allowing proper cure time causes leaks
  • Skipping contingency: 10-15% buffer essential for hidden issues

Sources and further reading

Wet-area waterproofing requirements come from the National Construction Code and AS 3740; licensing rules differ by state and territory, so check your local building regulator. We do not publish market price ranges we cannot substantiate - use itemised quotes from licensed renovators for current pricing.

FAQ

Frequently Asked Questions

Clear answers to the questions homeowners usually ask before comparing quotes.

1

What drives bathroom renovation costs in Australia?

The biggest cost drivers are size and scope (a cosmetic refresh costs far less than a full strip-out or layout change), the extent of tiling and waterproofing, fixture and vanity quality, and whether plumbing is being moved. Site factors like access, floor type (concrete slab vs timber) and hidden damage in older homes also move the price. Get 3+ itemised quotes from licensed bathroom renovators and compare inclusions, exclusions and warranties line by line.
2

How long does a bathroom renovation take?

Bathroom renovation timelines depend on scope. Cosmetic refresh (no layout changes): typically 1-2 weeks including tile replacement, new fixtures, painting. Standard renovation (same layout): typically 3-4 weeks for full strip-out, waterproofing, retiling, new plumbing fixtures. Complete rebuild (layout changes): typically 4-6 weeks including structural work, plumbing relocation, electrical additions. Allow extra time for council approval if a CDC is required, and for weather delays or material availability.
3

Do I need waterproofing for bathroom renovation?

Yes, waterproofing is mandatory for all wet areas in Australian bathrooms per the Building Code (AS 3740). Required waterproofing areas: shower floors and walls up to 1.8m high, bath surrounds to 150mm above bath rim, bathroom floors (entire floor recommended), and behind all wall tiles in wet zones. A licensed waterproofer must certify the work. Non-compliant waterproofing leads to leak damage that is expensive to rectify and can void insurance.
4

What is the best tile size for small bathrooms?

For small bathrooms (under 5sqm), large format tiles (600x600mm or 600x1200mm) create illusion of more space with fewer grout lines. Avoid busy patterns or very small mosaics which make space feel cluttered. Light colors (white, cream, light grey) reflect light and enlarge perception of space. Consider vertical stacking of tiles to add height. Floor-to-ceiling tiling in shower makes space feel larger.
5

Should I move the toilet when renovating?

Moving the toilet adds plumbing costs that grow with the distance moved and depend on your floor type. Only move it if: improving ergonomics or layout efficiency, creating space for a larger shower or vanity, fixing poor original placement, or relocating from an external to internal wall. Concrete slab floors make toilet relocation significantly more expensive because the slab must be cut and waste pipes relocated; timber floor homes are easier and cheaper. If budget is tight, keep the toilet in the same location.
6

What does bathroom waterproofing involve?

Professional waterproofing covers surface preparation, membrane application (2-3 coats of liquid membrane or a sheet membrane), reinforcing of joints and penetrations, a minimum 7-day cure before tiling, and a compliance certificate from the licensed waterproofer. You must use a licensed waterproofer - DIY waterproofing commonly fails and insurance won't cover the resulting leak damage. Ask what warranty period the waterproofer provides and get it in writing.
7

What ventilation is required in bathrooms?

Australian Building Code requires mechanical ventilation (exhaust fan) if no external window, or window under 10% of floor area. Minimum exhaust rate: 25 litres/second for bathrooms. Exhaust fan must: vent directly outside (not into roof space), have backdraft damper, operate via light switch or separate switch. For windowless bathrooms, consider a ceiling-mounted exhaust with timer or humidity sensor to prevent mould and moisture damage.
8

Can I renovate my bathroom myself?

You can do some DIY work but licensed trades required for: plumbing (licensed plumber only), electrical (licensed electrician only), waterproofing (licensed waterproofer), and gas (licensed gasfitter if gas hot water). DIY-friendly tasks: demolition, painting, tiling (if competent), installing vanity/mirror, grouting, sealing. Risks of unlicensed work: insurance void for water/electrical damage, cannot obtain compliance certificates, difficulty selling property, and significant fines. Save money by doing demolition/preparation yourself, then hire licensed trades for regulated work.
9

What is the best flooring for bathrooms in Australia?

Porcelain tiles are a strong all-round choice for Australian bathroom floors - waterproof, durable, slip-resistant when textured, easy to clean, and available in endless designs. Natural stone (travertine, marble, limestone) looks premium but requires sealing and costs more. Avoid: laminate (swells with water), hardwood (warps), carpet (harbors mold). Choose tiles with R10+ slip rating for wet areas. Large format tiles (600x600mm) reduce grout lines and cleaning. Ensure proper falls to floor waste (1:100 minimum slope).
10

Is it worth renovating bathroom before selling?

It depends on your suburb, your buyers and the rest of the home - there is no reliable universal return figure. A very dated or dysfunctional bathroom can put buyers off, so a tidy renovation with neutral, modern finishes often helps a sale. A high-end renovation beyond your suburb's price ceiling rarely pays for itself. Weigh the buyer profile in your area and the condition of the rest of the home, and ask a local agent what comparable homes offer before committing.
Free quote match

Get Your Free Bathroom Renovation Quotes in 60 Seconds

Compare prices from licensed bathroom specialists. No obligation, 100% free.

Verified bathroom renovation specialists

Matched by project type, service area and availability.

Compare scope, inclusions and timing

Understand what each quote includes before choosing.

Free, fast and no obligation

Most quote requests receive responses within 24-48 hours.

Bathroom Renovation quote match

Get your free quotes

Secure

About your Bathroom Renovation Project

Flexible payment plans via our trusted finance partner

SSL Secure
No obligation
Privacy Protected
Finance available

Need help financing your bathroom renovation?

Explore flexible payment options through our trusted finance partner Fundd, with fast approval pathways and competitive lending options.

Learn About Finance Options

No obligation. Check options before you commit to a project.

Trusted finance partner

Fundd Finance

Fundd

Australian home improvement finance support.

Fast Approval
Flexible Terms
Competitive Rates

Ready to renovate your bathroom?