Home Renovation Quotes Australia 2026

The Wombat™ connects Australian homeowners with licensed renovation builders. Get 3 free quotes for kitchen renovations ($15K-$80K), bathroom renovations ($10K-$50K), second-storey extensions ($150K+), and whole home renovations ($100K-$500K+). All builders are licensed, insured, and provide 6-7 year structural warranties.

Key benefits: Save 15-25% by comparing quotes, 100% free service with no obligation, fast 24-48 hour response, licensed and insured contractors only, complete project management, council approval handling, and quality workmanship guarantees.

Service coverage: All Australian capital cities including Sydney, Melbourne, Brisbane, Perth, Adelaide, Canberra, Hobart, and Darwin, plus regional areas.

Renovation Pricing Australia 2026: Kitchen renovation $15,000-$80,000+ (budget to luxury), Bathroom renovation $10,000-$50,000+ (basic to premium spa), Second-storey extension $150,000-$500,000+ (structural complexity), Whole-home renovation $100,000-$500,000+ (depends on size and finishes), Cosmetic refresh $20,000-$50,000 (paint, flooring, fixtures). Costs include materials, labor, permits, design fees, and 10-20% contingency buffer.

Cost Per Square Metre: Renovation $1,500-$3,000/m², Rebuild $2,500-$4,000/m². Kitchen renovation averages $800-$1,500/m² for mid-range finishes.

Renovation Timelines: Kitchen renovation 4-8 weeks, Bathroom renovation 3-6 weeks, Second-storey extension 6-12 months (includes council approval), Whole-home renovation 3-9 months, Cosmetic renovation 2-4 weeks. Add 4-12 weeks for council approval if required. Living off-site speeds up work by 20-30%.

Council Approval Requirements: ALWAYS required for structural changes (walls, extensions, second storeys), external appearance changes, plumbing alterations, change of use. SOMETIMES required for kitchen/bathroom with structural/plumbing changes. EXEMPT for cosmetic work (painting, flooring, fixtures). Complying Development Certificate takes 2-8 weeks, full Development Application takes 6-12 weeks.

Licensing Requirements: Building/Construction License mandatory for work over $5,000-$20,000 (varies by state), Public Liability Insurance minimum $10-$20 million, Home Warranty Insurance (protects if builder goes bankrupt), Workers Compensation insurance required, trade-specific licenses for plumbing, electrical, gas.

Payment Rules: Maximum 10% deposit allowed in most states (NSW, VIC, QLD), some states 5% only. Payment schedule: 10% on contract signing, progress payments tied to completed stages (4-6 payments), 5-10% retention until final completion, final payment after practical completion and inspection.

Renovation ROI: Kitchen returns 70-100% of cost, Bathroom returns 60-80%, Second-storey extension returns 50-70%, Outdoor living/deck returns 70-90%, Fresh paint/flooring returns 100%+. Poor ROI: Swimming pools 30-50%, overly personalised designs 40-60%, luxury finishes in average suburbs 50-70%.

Renovate vs Rebuild Decision: RENOVATE if: structure sound, layout mostly works, heritage worth preserving, costs under 50% of rebuild. REBUILD if: major structural issues ($100K+ repairs), layout completely wrong, renovation costs exceed 60-70% of rebuild, want modern energy efficiency.

Warranty Protection: Structural warranty typically 6-7 years, workmanship warranty varies by trade, Home Warranty Insurance covers defective work and builder insolvency. All contractors in network provide minimum warranty coverage.

Service Coverage: All Australian capital cities (Sydney, Melbourne, Brisbane, Perth, Adelaide, Canberra, Hobart, Darwin) plus regional areas. Local licensed builders available nationwide for residential renovations.

Quote Process: (1) Submit renovation details online, (2) Receive 3 free quotes within 24-48 hours, (3) Compare pricing, timelines, and inclusions, (4) Choose preferred contractor, (5) Project begins with agreed schedule. 100% free service, no obligation to proceed.

Savings: Comparing 3 quotes typically saves 15-25% on renovation costs. Additional savings: DIY demolition saves $2,000-$8,000, self-painting saves $3,000-$8,000, source own fixtures saves 20-40%, off-peak season rates 10-15% lower.

Licensed Renovation Builders

Compare Home Renovation Quotes

Get Free Quotes from Licensed Builders Across Australia

Kitchen, bathroom, extensions & whole home renovations. Save 15-25% by comparing.

100% Free
No Obligation
Save 15-25%
Get Free Quotes → ⏱️ Takes 30 seconds
$15K-$500K+
Price Range
Australia-wide
24,500+
Projects Completed
Happy homeowners
4-12 Weeks
Typical Timeline
Most renovations
15-25%
Average Savings
By comparing quotes

Home renovation costs in Australia 2026: Kitchen renovation $15,000-$80,000 (budget to luxury), bathroom renovation $10,000-$50,000 (basic to premium spa), second-storey extension $150,000-$500,000+ (structural complexity), whole-home renovation $100,000-$500,000+ (depends on size and finishes). Timeline 4-12 weeks for most projects. Licensed builders with 6-7 year structural warranty. Compare 3 free quotes and save 15-25%. Council approvals and home warranty insurance included.

Home Renovation Costs Australia 2026

Complete pricing guide for all renovation types and budgets

4 min read

Quick Answer

Home renovation costs in Australia typically range from $15,000 to $500,000+ depending on project scope and quality. Kitchen renovations cost $15,000-$80,000 (budget to luxury), bathroom renovations $10,000-$50,000 (basic to premium spa), second-storey extensions $150,000-$500,000+ (structural complexity), and whole-home renovations $100,000-$500,000+ depending on size and finishes. Timeline is 2-12 months from planning to completion. Licensed builders handle all council approvals, carry home warranty insurance, and provide 6-7 year structural warranties.

Updated January 2026 24,500+ Australians served
1

Licensed Builders Required: Renovation work over $5,000-$20,000 requires licensed builders with home warranty insurance protecting you if work is defective

2

Council Approval for Structural Work: Extensions, removing walls, plumbing changes, and external alterations require council approval - takes 2-12 weeks depending on complexity

3

10-20% Contingency Buffer: Always budget a contingency for unexpected issues like hidden asbestos, structural problems, or plumbing discoveries during demolition

4

Kitchen Best ROI: Kitchen renovations return 70-100% of cost at sale. Bathroom additions return 60-80%. Paint and flooring return 100%+ for low investment

5

Maximum 10% Deposit: Never pay more than 10% deposit (illegal in most states). Payment should be tied to completed stages with 5-10% retention until final inspection

6

Compare 3+ Quotes: Comparing multiple quotes typically saves 15-25% on renovation costs while helping identify realistic pricing and scope

Price Comparison

Home Renovation Cost Guide Australia 2026

Comprehensive pricing for all renovation types

Renovation Price Guide - By Project Type

Renovation Type Price Range Timeline ROI
Kitchen Renovation $15,000-$80,000 4-8 weeks 70-100%
Bathroom Renovation $10,000-$50,000 3-6 weeks 60-80%
Second-Storey Extension $150,000-$500,000+ 6-12 months 50-70%
Whole-Home Renovation $100,000-$500,000+ 3-9 months 50-80%
Cosmetic Refresh $20,000-$50,000 2-4 weeks 100%+

*Prices include materials, labor, permits. Excludes architect fees, structural engineering, and contingency buffer.

1,500+
Projects Completed
Australia-wide success
15-25%
Average Savings
Compare quotes benefit
6-7 Yr
Warranty Period
Structural workmanship
100%
Licensed Builders
Verified contractors
Full-Service Renovation

What's Included in Professional Renovation Quotes Australia?

Comprehensive services from licensed builders and contractors - everything you need from design to completion.

Get Free Renovation Quotes
Modern kitchen renovation in Australia featuring custom cabinetry installation, stone benchtops, and professional workmanship by licensed builders

Project Planning & Design

Site assessment, detailed plans, 3D renders, material selection, timeline scheduling, and council approval coordination.

Demolition & Site Prep

Safe removal of existing fixtures, structures, and finishes. Skip bins, waste removal, site protection, and asbestos testing if required.

Licensed Trade Work

Certified builders, electricians, plumbers, tilers, carpenters. All work complies with building codes and safety standards.

Structural Work

Wall removal/addition, beam installation, foundation work, steel reinforcement. Engineered solutions with structural certifications.

Quality Materials & Finishes

Premium cabinets, benchtops, tiles, fixtures, flooring, paint. Wide range of styles and price points to suit your budget.

Warranty & Compliance

6-7 year structural warranty, home warranty insurance, compliance certificates, final council inspections, and occupancy permits.

Step-by-Step Process

Home Renovation Process Australia: Step-by-Step Guide

From initial concept to final completion - what to expect during your renovation

Professional bathroom renovation in Australia showing plumbing installation, tile removal, and waterproofing work by licensed tradespeople
7-26 weeks typical timeline
1

Planning & Design

2-8 weeks

Initial consultation, detailed plans, material selection, council approval, contract signing.

2

Demolition & Structural

1-4 weeks

Site protection, demolition, structural work, rough-in plumbing and electrical.

3

Installation & Fit-Out

3-12 weeks

Insulation, plasterboard, waterproofing, tiling, cabinets, fixtures, painting, flooring.

4

Completion & Handover

1-2 weeks

Final clean, inspection, defects fixed, compliance certificates, warranty documents.

Pricing Guide

Australia Home Renovation Costs by Project Type 2026

Typical pricing across Australia — costs vary by location, materials, and project scope

Kitchen Renovations

1
$15,000-$50,000+

Complete kitchen transformation

⏱️ 4-8 weeks

Bathroom Renovations

2
$10,000-$35,000

Full bathroom upgrade

⏱️ 2-4 weeks

Home Extensions

3
$1,500-$3,500/sqm

Add living space to your home

⏱️ 8-16 weeks

Outdoor Living

4
$8,000-$40,000

Decks, patios, and entertaining areas

⏱️ 2-6 weeks

Granny Flats

5
$100,000-$180,000

Self-contained secondary dwelling

⏱️ 12-20 weeks

Whole Home Renovations

6
$50,000-$200,000+

Complete property transformation

⏱️ 12-24 weeks
Calculator

Free Renovation Cost Calculator Australia 2026

Get an instant estimate for your renovation project

Configure Your Renovation
Design Materials Labor Plumbing Electrical Finishes
Estimated Cost
$200,000 - $350,000

Based on typical Australian projects

Get Accurate Quotes
✓ Free  •  ✓ 3 quotes  •  ✓ Save 15-25%
Licensed & Verified

Why Choose Licensed Renovation Contractors Australia?

Licensed builders deliver quality, safety, and peace of mind

Increase Property Value

Quality renovations return 50-100% of cost. Kitchen/bathroom renos add $50K-$150K+ to home value.

Legal Protection

Licensed contractors provide home warranty insurance. You're protected if work is defective or builder goes bankrupt.

Structural Expertise

Builders understand load-bearing walls, foundations, engineering. Prevents dangerous structural failures.

Building Code Compliance

Professional work meets all safety standards, passes inspections, and gets certifications required by law.

Project Management

Builders coordinate all trades, manage timeline, order materials, handle issues. You have one point of contact.

Quality Workmanship

Licensed trades with years of experience. Work backed by 6-7 year structural warranty. No DIY mistakes.

Professional Design

Designers optimize layout, flow, and functionality. 3D renders help visualise final result before building starts.

Insurance Coverage

Public liability insurance protects you from accidents. Workers comp covers injuries. Your assets are protected.

Decision Guide

Should You Renovate or Rebuild Your Home? Complete Guide 2026

Use this guide to determine the best approach for your property and budget

Renovation VS Rebuild

Choose Renovation

Best for most homeowners

  • Structure is sound
    Foundation, framing, and roof in good condition
  • Costs under 50% of rebuild
    Significantly cheaper than starting over
  • Layout mostly works
    Only minor changes needed
  • Fast timeline needed
    6-12 weeks vs 12-18 months for rebuild
  • Heritage worth preserving
    Period features or heritage listing
  • Established landscaping
    Mature trees and gardens to keep
  • Can live on-site
    Section-by-section work possible
$

Expected Cost Range

$50K - $300K

Depends on scope, size, and finishes

Choose Rebuild

When renovation isn't viable

  • Major structural issues
    Foundation problems or termite damage exceeding $100K
  • Layout completely wrong
    Would require gutting entire home
  • Costs exceed 70% of rebuild
    Rebuilding offers better value
  • Want modern efficiency
    Superior insulation, solar-ready, smart wiring
  • Property supports investment
    Premium suburb justifies $800K+ rebuild
  • Asbestos throughout
    Removal costs $15K-$50K+ making rebuild viable
  • Want complete customisation
    Design dream home from scratch
$

Expected Cost Range

$350K - $800K+

Depends on location, size, and quality level

Get a Professional Structural Inspection First

Before making this critical decision, invest $500-$1,000 in a comprehensive structural inspection. Hidden issues like foundation movement, termite damage, or asbestos can dramatically change the renovation vs rebuild equation.

Get quotes from builders who can assess your situation
Fundd Finance
Trusted Partner
Finance Available

Need help financing your renovation?

Finance projects from $10,000-$500,000+ with flexible payment options through our trusted partner Fundd.

Learn About Finance Options
Fast Approval
Flexible Terms
Competitive Rates
Consumer Protection

Home Renovation Warranties & Insurance Australia: Complete Guide

All contractors in our network provide comprehensive warranty coverage for your peace of mind

Structural Work

6-7 Years

Load-bearing walls
Foundation work
Beam installation
Roofing structure

Workmanship

2-5 Years

Installation defects
Trade workmanship
Fit and finish issues
Building defects

Materials

Varies

Cabinets: 5-10 years
Appliances: 1-5 years
Tiles: 10-25 years
Paint: 5-10 years

Home Warranty

6-7 Years

Builder bankruptcy
Non-completion
Major defects
Mandatory $20K+ jobs

What's Covered

  • Structural defects causing damage
  • Defective workmanship
  • Premature material failure
  • Non-completion by builder
  • Code compliance issues

What's NOT Covered

  • Normal wear and tear
  • Damage from misuse
  • Unauthorized modifications
  • Cosmetic-only defects
  • Acts of nature

Essential Tips

  • 1 Get warranty terms in writing
  • 2 Verify home warranty insurance
  • 3 Document defects with photos
  • 4 Keep all invoices & receipts
  • 5 Report issues immediately
Why Use The Wombat™?

The Wombat™ vs DIY: Why Use Our Free Quote Service?

Feature The Wombat™ DIY
Time to Get Quotes 24-48 hours 1-2 weeks
Number of Quotes 3 verified 1-2 if lucky
Quality Guarantee Licensed & insured Hit or miss
Price Comparison Side-by-side Difficult
Support Full project help On your own
Cost 100% FREE Costs your time
Simple Process

How It Works

Getting quotes from licensed renovation builders is simple and free

1

Tell Us What You Need

Fill out a simple form describing your renovation needs. Takes less than 2 minutes.

2

Receive Multiple Quotes

Get up to 3 quotes from licensed renovation builders within 24 hours.

3

Choose & Save

Compare quotes, designs, and materials. Choose the best builder and save up to 30% on your renovation.

Free Quotes in 24 Hours

Get 3 Free Renovation Quotes from Licensed Builders Near You

Compare prices from licensed Australian renovation builders. No obligation, 100% free.

Licensed Australian Builders Only

All builders are fully licensed, insured & experienced in renovations

Save 15-25% on Your Renovation

Average savings by comparing multiple quotes from local builders

Quotes in 24 Hours

Fast response from local renovation specialists Australia-wide

Recent renovation quotes
Kitchen Renovation - Sydney 2 hours ago
Bathroom Remodel - Melbourne 4 hours ago
Full Home Renovation - Brisbane Yesterday

Get Your Free Quotes

Secure
No spam
No obligation
100% free
2,050+ renovations completed through The Wombat™
Verified Reviews

What Australia Customers Say about Home Renovations

Real home renovations reviews from verified Australia customers

5.0 out of 5
Based on 3 verified reviews

Home Renovations reviews in Australia. 3 verified customer reviews with 5.0/5 average rating. Real experiences from local customers.

Verified

Our kitchen renovation exceeded expectations! The builder was professional, stayed on budget, and finished on time. The new space is absolutely stunning.

Kitchen Renovation
Verified

Bathroom reno turned out perfect. Great communication throughout, quality workmanship, and they cleaned up every day. Highly recommend!

Bathroom Renovation
Verified

Second storey extension transformed our home. The builder managed everything - council approvals, engineering, construction. Worth every dollar.

Home Extension
5.0/5 Average Rating 3 Customer Reviews Wombat™ Verified Australia Area Home Renovations

Start Your Renovation Project Today — Get Free Quotes

Compare up to 3 competitive quotes from licensed builders in your area. No obligation, fast response within 24-48 hours.

Fast Response
Verified Builders
No Obligation
FAQ

Frequently Asked Questions

Get answers to common questions about this topic

1

How much does a home renovation cost in Australia?

Renovation costs vary significantly by project type and scope: Kitchen renovation $15,000-$80,000+ (budget to luxury), bathroom renovation $10,000-$50,000+ (basic to premium spa), second-storey extension $150,000-$500,000+ (structural complexity), whole-home renovation $100,000-$500,000+ (depends on size and finishes), cosmetic refresh (paint, flooring, fixtures) $20,000-$50,000. Costs include materials, labor, permits, design fees, and contingency (typically 10-20% buffer for unexpected issues).
2

How long does a renovation take?

Renovation timelines depend on project complexity: Kitchen renovation 4-8 weeks (full replacement with structural changes), bathroom renovation 3-6 weeks (full gut and rebuild), second-storey extension 6-12 months (includes council approval, structural engineering, full build), whole-home renovation 3-9 months (depends on scope and whether you live on-site), cosmetic renovation 2-4 weeks (paint, flooring, fixtures only). Add 4-12 weeks for council approval if required. Living off-site speeds up work by 20-30% as trades have unrestricted access.
3

Do I need council approval for renovations?

Council approval requirements vary by project scope and location: ALWAYS required for structural changes (removing/moving walls, extensions, second storeys), changes to external appearance (facade, roofline, additions), plumbing/drainage alterations, change of use (converting garage to bedroom). SOMETIMES required for kitchen/bathroom if structural or plumbing changes. EXEMPT for cosmetic work (painting, flooring, fixtures, cabinets without structural changes). Requirements vary by council - some areas have heritage overlays or stricter rules. Approval process takes 2-8 weeks (Complying Development Certificate) or 6-12 weeks (full Development Application). Your contractor should advise on requirements and often handles the application process.
4

Should I get a project manager for my renovation?

A renovation project manager (PM) coordinates all trades, manages timeline, handles problems, and ensures quality. Benefits: reduces stress significantly (you have one point of contact), prevents costly mistakes (experienced oversight catches issues early), faster completion (proper trade scheduling avoids delays), better quality (professional standards enforcement), handles disputes with contractors. Costs: typically 10-15% of project value, or $150-$250/hour. Worth it for: projects over $100K, complex renovations with multiple trades, if you work full-time and can't oversee daily, first-time renovators unfamiliar with building process. NOT needed for: simple single-trade jobs (kitchen cabinet replacement), small cosmetic updates, if your builder provides full project management (many do).
5

What's included in a renovation quote?

Standard renovation quote inclusions: labor for all trades (builders, plumbers, electricians, tilers, painters), materials and supplies, demolition and site preparation, waste removal and skip bins, basic project management and coordination, warranty on workmanship (typically 6-7 years structural). NOT usually included: council approval fees and application ($500-$3,000), architect/designer fees (10-15% of project cost), structural engineering reports ($1,500-$5,000), asbestos removal if discovered ($2,000-$15,000), temporary accommodation if required, decorative items (artwork, furnishings), premium appliances and fixtures (allowances given instead), landscaping and driveways. Always get itemized quotes and clarify ALL inclusions/exclusions in writing before signing.
6

Can I live in my home during renovation?

Living on-site during renovation is possible but challenging. Kitchen renovations: very difficult (no cooking facilities for 4-8 weeks), requires temporary kitchen setup, high dust and noise. Bathroom renovations: manageable if you have 2+ bathrooms, challenging with only one (need alternate facilities). Whole-home renovations: extremely difficult, most people move out. Second-storey extensions: possible if ground floor remains functional, but very noisy and dusty. Tips if staying: set up temporary kitchen (microwave, portable cooktop, mini fridge), seal off renovation area with plastic sheeting, expect 7am-5pm noise and disruption, work finishes 20-30% faster if house is empty (unrestricted access), consider short-term rental for major renovations (often worth the cost for sanity and speed).
7

How do I choose between renovation and rebuilding?

Renovation vs rebuild decision depends on several factors: RENOVATE if: structure is sound (no major foundation/framing issues), layout mostly works (only minor changes needed), heritage/character worth preserving, renovation costs under 50% of rebuild cost, fast timeline needed (renovations faster than rebuild). REBUILD if: major structural issues ($100K+ in repairs), layout completely wrong for needs, renovation costs exceed 60-70% of rebuild, property value supports investment, want modern energy efficiency (insulation, solar-ready). Cost comparison: renovation $1,500-$3,000/m², rebuild $2,500-$4,000/m². Always get structural inspection ($500-$1,000) before deciding - hidden issues like asbestos, termites, or foundation problems can tip the decision toward rebuild.
8

What renovation adds the most property value?

Highest ROI renovations in Australia: Kitchen renovation returns 70-100% of cost (modern kitchen is top buyer priority), bathroom addition/renovation returns 60-80% (extra bathroom highly valuable), second-storey extension returns 50-70% (adds bedrooms and living space), outdoor living/deck returns 70-90% (alfresco dining very popular), fresh paint/flooring returns 100%+ (low cost, high impact). POOR ROI renovations: swimming pools return 30-50% (maintenance concerns for buyers), overly personalised (bold colors, unique layouts) returns 40-60%, luxury finishes in average suburbs return 50-70% (over-capitalizing). Best strategy: renovate to match suburb standards (don't under or over-capitalize), focus on kitchens and bathrooms first, keep finishes neutral and timeless, ensure good floor plan flow.
9

Are renovation contractors licensed and insured?

Yes, all renovation contractors in our network hold: Building/Construction License from state authority (mandatory for work over $5,000-$20,000 depending on state), Public Liability Insurance minimum $10-$20 million coverage, Home Warranty Insurance (protects you if builder goes bankrupt or work is defective), Workers Compensation insurance for all employees, trade-specific licenses where required (plumbing, electrical, gas). We verify all licenses before contractor approval. YOU should also verify: check license number on state licensing authority website (free), confirm insurance is current and adequate, check for complaints/disciplinary action, ask for references from recent similar projects, never pay more than 10% deposit (illegal in most states), use contracts that comply with state regulations.
10

How much should I pay upfront for renovations?

Legal deposit limits vary by state but generally: maximum 10% deposit allowed in most states (NSW, VIC, QLD), some states allow up to 5% only, NEVER pay more than legal limit (major red flag). Payment schedule should be: 10% on contract signing, progress payments tied to completed stages (typically 4-6 payments), 5-10% retention held until final completion and defects period, final payment after practical completion and your inspection. WARNING SIGNS: requests for large upfront payment (over 10%), cash payments "to save on GST" (illegal and removes consumer protections), payment to personal accounts rather than business, pressure to pay before work stages complete. Legitimate contractors have business cashflow and don't need large upfront payments.
11

What should I ask contractors before hiring?

Essential questions for renovation contractors: Are you licensed and can I see your license number? (verify independently), What insurance do you carry and can you provide certificates? (public liability, home warranty, workers comp), Can you provide 3 recent references for similar projects? (actually call them), What's the detailed timeline with milestones? (realistic scheduling), What payment schedule do you use? (should align with completed stages), How do you handle variations and unexpected costs? (change order process), Who will be my main contact during the project? (consistent communication), What warranty do you provide on workmanship? (6-7 years structural minimum), Do you use subcontractors or your own team? (either fine, but know who's on site), How do you handle site cleanliness and rubbish? (daily cleanup expectations).
12

How can I save money on renovations?

Smart ways to reduce renovation costs: Do demolition yourself (save $2,000-$8,000 but check if contractor allows), paint yourself after trades finish (save $3,000-$8,000 on labor), source your own fixtures and tiles (save 20-40% on retail vs contractor markup), renovate in off-peak season (winter rates 10-15% lower, more availability), keep original layout where possible (moving plumbing/walls is expensive), choose quality mid-range over luxury finishes (80% of the look, 50% of the cost), get 3 quotes and negotiate (competition drives better pricing), avoid scope creep and changes mid-project (variations cost premium). DON'T skimp on: structural work (dangerous if done poorly), waterproofing (leaks cost more to fix later), electrical and plumbing (safety critical, requires licensed trades), proper insulation (pays back in energy savings).

Ready to start your renovation?

Get Free Quotes
Last updated: February 2026
Verified by licensed builders and renovation specialists
Australia-wide coverage

Prices are estimates based on market research and may vary by location, project size, site conditions, and specialist. Always get multiple quotes for accurate pricing. Renovation work requires building permits and compliance with building codes for structural changes.

Amanda S. from Ulverstone, TAS

requested Tree Removal

2 hours ago