Skip to main content

Home renovation planner

Plan the renovation before comparing builder quotes

Define the rooms, outcomes and constraints, understand the approval and asbestos questions for your home, then compare itemised proposals against the same brief.

Build your project brief

A request may be sent to up to three eligible suppliers, subject to service-area and supplier availability. Supplier availability and quote outcomes vary.

Kitchen mid-renovation with cabinetry being installed and protective floor coverings
Local Coverage

Renovation planning by city

Browse location pages for major Australian cities. Supplier coverage and availability vary by area.

Select your nearest city to compare local suppliers, suburb coverage and quote options.

Clear matching limits

How supplier matching works

Submit your project details once. We look for eligible local suppliers; availability and response times vary.

Up to 3

Supplier matches

Eligible suppliers are selected by service, area and current availability

Every one

ABN-checked suppliers

Suppliers are ABN-checked and manually reviewed before receiving leads

$0

Free for homeowners

No payment and no obligation to hire

No obligation

You decide

Compare any responses and choose whether to proceed

Free to request
Matching subject to supplier availability
No obligation to proceed

Before requesting proposals

Give every builder the same renovation brief

Your brief defines the request; it does not establish feasibility, approvals or structural options. Builders may still need to inspect the home before confirming scope.

1

Define the rooms and outcomes

List the rooms or areas in scope and the outcome you want for each. Separate must-haves from nice-to-haves so proposals can be compared against the same core request.

2

Document the existing home

Photograph the areas in scope, note the approximate age of the home, and gather any plans, previous approvals, strata by-laws or reports you already hold.

3

Note the services involved

Record where plumbing, gas, electrical and drainage currently run in the affected areas, and whether fixtures are staying in place or moving. Relocations change scope significantly.

4

Living arrangements and access

Note whether you plan to live in the home during the work, plus parking, access routes and any site constraints a builder should plan around.

Property-specific checks

A renovation quote is not an approval or a structural assessment

Approval, asbestos, structural, strata and contract questions belong in the brief before a start date is agreed.

Approvals for the exact address

Whether a renovation needs approval depends on the scope, the property and the planning controls that apply. Check with the responsible council or a certifier before assuming a rule from elsewhere applies.

Asbestos-era materials

Homes built or renovated before 1990 may contain asbestos in walls, floors, eaves and wet areas. Do not cut, drill or sand suspect material; arrange an appropriate assessment before demolition or strip-out.

Structural changes need design input

Removing or altering walls, openings and floors requires design and engineering input specific to the building. A quote is not a structural assessment.

Strata, heritage and shared property

Check strata or body-corporate approval requirements, heritage or character controls, and any easements or shared services before committing to a start date.

Wet areas and waterproofing

Bathroom, laundry and kitchen work involves waterproofing and compliance requirements that vary by jurisdiction. Ask who certifies this work and what documentation you receive.

Contract and payment rules

Home building contracts, deposits and staged payments are regulated differently by state and territory. Check the rules for your jurisdiction before signing or paying.

Scope and delivery

Ask how the renovation will actually be delivered

Two proposals for the same rooms can describe very different projects. These questions surface the differences before you compare totals.

Who designs, who builds

Ask whether the builder works from your drawings, provides design services, or expects decisions along the way, and who coordinates architects, engineers and certifiers.

Allowances and provisional sums

Ask which parts of the proposal are fixed and which are allowances or provisional sums, how they were estimated, and how differences are handled when real selections are made.

Sequencing and staging

Ask how the work will be staged, what happens first, which trades are involved at each stage, and what depends on approvals, materials or third parties.

Selections and supply

Ask what you are expected to select and by when, what the builder supplies versus what you supply, and how changes to selections are documented and priced.

Compare like with like

Make each renovation proposal answer the same six questions

A total is only comparable when the scope, allowances, site management and payment terms behind it are visible.

1

Scope and referenced documents

The rooms and work included, the drawings or specifications the price is based on, and any assumptions that still need confirmation.

2

Inclusions and exclusions

What is supplied, installed and finished by the builder, and what is explicitly out of scope or by others.

3

Allowances

Every prime-cost item and provisional sum, the amount allowed, and the process when actual costs differ.

4

Site management

Protection of the home, dust and waste management, site amenities, working hours and how occupants are accommodated.

5

Approvals and compliance

Responsibility for approvals, certification, inspections and compliance documentation, and which certificates you receive at completion.

6

Payments, variations and defects

The payment schedule against stages, the written variation process, warranty responsibilities and how defects are handled after completion.

Provider due diligence

Check the builder against the actual job

Marketplace eligibility is not proof of a builder licence, insurance policy or capability for your project. Verify the evidence that matters before hiring.

Identity and licensing

Confirm the contracting entity and ABN, then check the licence or registration requirements for the work value and type in your state or territory.

Insurance evidence

Ask what insurance applies to the work, including any home building compensation or warranty insurance requirements in your jurisdiction, and request current evidence.

Relevant examples

Ask for examples of comparable renovations, ideally with owners you can speak to, rather than a general portfolio.

Subcontracting and supervision

Ask who manages the site day to day, which trades are subcontracted and how their work is checked.

Written variations

Require scope, selection and price changes to be documented and agreed in writing before the work proceeds.

Completion and handover

Agree how completion is defined, what documentation is handed over, and how post-completion defects are reported and fixed.

How it works

Request supplier matches in three simple steps

Requesting supplier matches is free and does not obligate you to hire.

1

Tell Us What You Need

Share details about your renovation needs using the request form.

2

Look for Supplier Matches

We look for up to 3 eligible renovation builders based on service fit, coverage and current availability.

3

Compare Any Responses

Compare any responses you receive, including scope, price, timing and supplier terms. You decide whether to proceed.

Authority directory

Starting points, not a national rulebook

Each source has a stated role and limit. Use the council, consumer body and licence register relevant to the property and proposed work.

NSW Government

Building or renovating a home

A New South Wales starting point covering approvals, contracts, licensing checks and consumer protections for home building work.

Limit: New South Wales only. Other states and territories have different legislation, thresholds and consumer bodies.

Open source page (opens in a new tab)

Asbestos and Silica Safety and Eradication Agency

Householders and home renovators

Australian Government guidance on asbestos in homes built or renovated before 1990 and what to do before disturbing materials.

Limit: Identification requires testing. State and territory rules govern assessment and removal; this page does not replace a licensed assessment.

Open source page (opens in a new tab)

YourHome (Australian Government)

Getting started

Federal guidance on planning, designing and briefing a home project, including renovation decisions and working with professionals.

Limit: Design and sustainability guidance. It does not cover approvals, licensing or contract rules for your jurisdiction.

Open source page (opens in a new tab)
The Wombat mascot holding a clipboard in front of a two-storey house under construction with scaffolding

Get up to 3 free renovation quotes for your property

Requesting quotes is free for homeowners, and a request may be sent to up to three eligible suppliers, subject to service-area and supplier availability. Share the rooms in scope, the outcomes you want and any known approval or asbestos questions. Builders may still need to inspect the home before proposing a scope.

About your Renovation Project

Flexible payment plans via our trusted finance partner

FAQ

Frequently Asked Questions

Clear answers to the questions homeowners usually ask before comparing quotes.

1

Do I need council approval for a renovation?

It depends on the scope, the property and the planning controls that apply to the exact address. Some internal work is treated differently from structural changes, extensions or work on heritage or strata properties. Check with the responsible council or a certifier before assuming a general rule applies.
2

What should a renovation quote include?

Compare the scope and referenced drawings, inclusions and exclusions, every allowance and provisional sum, site management arrangements, responsibility for approvals and certification, the payment schedule, the written variation process and how defects are handled after completion.
3

What are provisional sums and prime-cost allowances?

They are estimates in a quote for items not yet finally selected or priced, such as tapware or excavation conditions. Ask which parts of your proposal are fixed and which are allowances, how each was estimated, and how differences are handled when actual costs are known.
4

Could my home contain asbestos?

Homes built or renovated before 1990 may contain asbestos in walls, floors, eaves and wet areas. Do not cut, drill or sand suspect material. Arrange an appropriate assessment before demolition or strip-out, and treat any removal as a separate licensed scope.
5

Can I live in my home during the renovation?

That depends on the rooms in scope, whether water, power and sanitation stay connected, dust and safety controls, and the staging of the work. Discuss living arrangements with builders during quoting so proposals reflect the same assumptions.
6

Should I renovate or rebuild?

That is a design, budget and property question rather than a rule. The condition of the existing structure, the extent of change you want, planning controls and comparative proposals all matter. Independent design or building advice against your specific property is more useful than a general threshold.
7

How much should I pay upfront?

Deposits and staged payments for home building work are regulated differently by state and territory, and requirements can depend on the contract value. Check the rules for your jurisdiction, pay against a written contract and keep the payment schedule tied to completed stages.
8

How does The Wombat renovation request work?

Requesting a supplier match is free for homeowners. A request may be sent to up to three eligible suppliers, subject to service-area and supplier availability. Supplier availability and quote outcomes vary, and you should independently verify the provider and written scope before hiring.

Not sure how to choose between the builders who quote? Our national guide covers licence checks, insurance evidence and contract basics: How to hire a tradie in Australia. Weighing up doing parts yourself? See where the DIY line actually sits.

For builders and home renovation companies

On the tools? Get verified home renovation leads

Prepaid credits at $90 per verified lead - no subscriptions, no lock-in contracts. Set your service areas and daily limits, and only pay for the leads you receive.

See Home Renovation leads →

Planning a renovation?

Get free quotes