Skip to main content
Kitchen Renovation Guide

Kitchen Renovation Costs in Australia Make room for a kitchen you love.

Explore published cost examples, compare what quotes include and plan the kitchen that works for you.

The Wombat Team
Reviewed 13 October 2026

General information for Australian homeowners - not professional, legal or safety advice. Requirements vary by state and territory. How these guides are written

Kitchen with pendant lights and open doors to a garden
Quick Answer

What should you budget for a kitchen renovation?

Archicentre Australia's 2026 guide gives a $23,000-$49,000 kitchen fit-out reference, including GST, with appliances extra. It assumes standard selections, a sound room and good access. Your full budget depends on the existing kitchen, chosen products and work included. Use the examples below for context, then compare quotes for your project.

Published kitchen cost examples

These references cover different work. Compare the included scope before comparing the totals.

SourceScopePublished amountWhat to check
Archicentre Australia 2026 guide, page 4Kitchen wet-area fit-out reference$23,000-$49,000 including GSTStandard selections, sound room and good access assumed. Appliances are extra; confirm strip-out, repairs and other project work separately.
Plaza WorksAdvertised small mid-finish kitchen, Brisbane/Gold Coast$7,900-$20,100 including GSTUnder 8 lineal metres of kitchen run. Confirm the exact materials, appliances and work included in your written quote.
Perth Kitchen CraftersAdvertised Modern-style installed joinery, Perth$38,000-$55,000; GST basis not statedCovers design, cabinetry, hardware, delivery and installation. Benchtops, appliances, other trades and demolition need separate allowance.

Checked 13 October 2026. These are published references and businesses' own advertised ranges, not Wombat quotes or verified customer bills. Confirm current inclusions and the full amount payable with the publisher.

Start with the work your kitchen needs

Tell contractors what you want to keep, replace or move. A small kitchen can still involve substantial preparation and trade work.

ScopeWhat it meansConfirm in the quote
Refresh the existing kitchenKeep a workable layout and update selected finishes or fittings.Confirm which cabinets, appliances and surfaces can stay, and what needs repair.
Replace in the same layoutInstall a new kitchen without planning new fixture positions.Compare cabinetry, benchtops, splashbacks, trade work and reinstatement.
Redesign the spaceChange the layout, storage or connection to other rooms.Price the proposed design, service relocation, building work and approvals.

Share room measurements and photos, then have the contractor assess the existing kitchen. Floor area alone does not show the amount of cabinetry or the work needed.

What your kitchen quote should cover

Ask for enough detail to compare the same work and products, not just the headline total.

WorkAsk for
Strip-out and preparationProtection, service disconnection, waste removal, surface repairs and how hidden damage or hazardous materials are handled.
Cabinetry and storageDimensions, door and carcass finishes, hardware, internal fittings, delivery, assembly and installation.
Benchtops and splashbacksThe exact products, measured quantities, joins, edges, cut-outs, fabrication and installation.
Appliances and servicesChosen models, supply allowances, installation, plumbing, electrical, ventilation and who completes each part.
Room finishesFlooring, wall repairs, painting and any work left outside the kitchen supplier's scope.
Completion and managementDesign, trade coordination, schedule, warranties, exclusions, payment terms and how changes are agreed.

Check which selections are fixed, which are allowances and what is excluded. Confirm the full amount payable, its tax basis and how additional work will be priced before it proceeds.

Choose the exact benchtop product

Ask for the product name, finish, thickness, joins, edges, cut-outs and installation work to be specified. Compare those details with the cabinetry and appliances they need to fit.

Australia's engineered-stone ban covers benchtops, panels and slabs that meet the legal definition. Resin-free porcelain and sintered stone, and artificial-stone products below 1% crystalline silica, are outside that definition. Check the exact product and current guidance with the supplier; a brand name or 'stone look' label is not enough.

Replacing an existing top? Have its material assessed before removal or alteration. Work on legacy engineered stone has specific rules, and permitted products can still create hazardous dust when processed. Leave that assessment and work to appropriately qualified contractors.

Ways to manage your kitchen budget

Choose what matters most to you, then have the alternatives priced before you commit.

  • Keep a workable layout if it meets your needs, and compare it with the cost of moving services.
  • Decide on cabinetry, benchtops and appliances early so quotes use the products you want.
  • Ask for simpler finishes or storage options to be priced as alternatives.
  • Check whether existing appliances or parts of the kitchen can be retained.
  • Agree how hidden issues and design changes will be assessed and priced.

Compare what each proposal includes rather than judging quality by price or brand alone. Before strip-out, have existing materials and services assessed. If asbestos may be disturbed, seek professional advice; see official guidance for home renovators.

Check the site and approval requirements

Give contractors the property address, access details and the proposed layout. Ask about deliveries, parking, stairs or lifts, service access and any building work so those items are included in the quote.

Check the proposed work with your council or building certifier before booking. Planning exemptions have conditions; NSW's exempt-development guidance is one example, not a nationwide rule. In strata, check the scheme's permissions separately; see NSW's strata renovation guidance.

Confirm who does the building and trade work, then check relevant licences, insurance and written terms before hiring.

Plan the schedule before work starts

Agree when the kitchen will be unavailable and plan an alternative place to prepare food. The programme should cover:

  1. Design, approvals and ordering cabinets, surfaces and appliances.
  2. Strip-out, assessment and preparation.
  3. Trade work, cabinetry and benchtop measurement, fabrication and fitting.
  4. Splashbacks, finishes, appliance connections, checks and handover.

Confirm lead times for your chosen products, who coordinates the trades, and how changes or delays will be handled.

Sources and further reading

These links support the examples and planning questions above. Named businesses are examples, without a Wombat endorsement or partnership implied. Confirm current prices and terms with the publisher and requirements with the relevant authority for your property.

Illustration of The Wombat mascot with plans in a kitchen
ABN
Checked
Ready to Get Started?

Bring your kitchen ideas to life.

Tell us what you want to change. We can send your request to up to 3 eligible local suppliers so you can compare proposals for your kitchen.

Matching depends on service area and supplier availability. Responses vary.

FAQ

Frequently Asked Questions

Clear answers to the questions homeowners usually ask before comparing quotes.

1

How much does a kitchen renovation cost in Australia in 2026?

Archicentre Australia's 2026 guide lists $23,000-$49,000 including GST for a kitchen fit-out reference, with appliances extra and stated assumptions. The published business examples cover different work. Use them for context, then compare complete quotes for your room, layout, products and included trades.
2

How long does a kitchen renovation take?

Get a written programme covering design, approvals, ordering, site work, benchtop fabrication, fitting and handover. Confirm when you will lose kitchen access and when it can be used again. Check the lead times for your chosen products and how delays or changes will be handled.
3

What's the biggest cost in a kitchen renovation?

It depends on your design and the work required. Ask for cabinetry, surfaces, appliances, preparation, trade work and coordination to be clearly described. Compare the same selections and inclusions across quotes rather than allocating a fixed percentage to each item.
4

Can I save money by keeping the kitchen layout the same?

Keeping a workable layout can avoid some relocation work. Ask for the existing-layout and redesigned options to be priced separately after the kitchen has been assessed. Compare the work and the result you want, without assuming a fixed dollar saving.
5

Do I need council approval for a kitchen renovation?

Check the proposed work with your council or building certifier before booking. Structural work, property restrictions and changes to services can affect the requirements. In strata, confirm the scheme's permissions separately. Ask which building and trade licences, checks and completion documents apply to your project.
6

Will a kitchen renovation add value to my home?

Do not assume a fixed share of the renovation cost will be recovered when you sell. If resale matters, ask a local agent or valuer about comparable properties and the design you are considering. Choose a budget that suits how you will use the kitchen as well as your selling plans.
7

Should I choose flat-pack or custom kitchen cabinets?

Compare the complete installed cost and the details that matter to you: dimensions, storage, finishes, hardware and installation. Ask who measures, orders, assembles and fits the cabinets, and which items are extra. Choose around the design, budget and service you need rather than a universal per-metre price or brand recommendation.
8

How much do kitchen benchtops cost?

Have the exact product and installation scope quoted, including quantities, joins, edges, cut-outs and splashbacks. Check that the selected product complies with the current engineered-stone rules. Assess an existing top before removal or alteration; its material affects the work required. A brand name or retail slab price alone does not establish the completed cost.
9

Are kitchen appliances included in renovation quotes?

Ask which models are supplied, which have allowances and which you need to buy separately. Confirm delivery, installation, connections and any cabinet changes needed to fit them. Compare the full scope with your selected appliances rather than assuming a standard package price.
10

What should I check before doing kitchen work myself?

Agree who will complete each part of the project and check the applicable licences and approvals before taking work on. Have existing materials and services assessed, including possible asbestos or legacy engineered stone. Ask the contractor about warranties and handover documents; do not cut or remove an unidentified stone top yourself.
Free quote match

Compare kitchen renovation quotes

Share your location, layout ideas and the work you want done. Ask for proposals that cover the same products, trade work and inclusions.

ABN-checked suppliers

We check ABNs. Check relevant licences, insurance and written terms before hiring.

Compare inclusions

Ask for the same products, trade work and exclusions to be itemised.

Free quote matching

No homeowner fee or obligation to hire. Supplier availability and responses vary.

Your kitchen project

Get your free quotes

Secure

About your Kitchen Renovation Project

Request a call from our partner Fundd to explore your finance options.

SSL Secure
No obligation
Privacy Protected
Explore finance

Need help financing your kitchen renovation?

Explore finance options with our partner Fundd. Tell us about your project and a representative will contact you to talk through your options.

Explore finance options

No obligation. Check options before you commit to a project.

Our finance partner

Fundd Finance

Fundd

Australian home improvement finance support.

Discuss your project
Understand the costs
Decide at your pace

Ready to renovate your kitchen?