Renovation approval guide

Council Approval for Renovations Check the Rules for Your Property

Check planning and building approvals for home renovations in Australia. Find official state and territory guidance, understand NSW pathways and prepare an approval checklist.

The Wombat Team
Updated 16 October 2026

General information for Australian homeowners - not professional, legal or safety advice. Requirements vary by state and territory. How these guides are written

House plans and drafting tools on a desk
Quick Answer 9 min read

Confirm the pathway before starting work

Renovation approval depends on the property, location and exact work. Check planning and building requirements separately, then any strata, plumbing or other permissions. Confirm the applicable pathway and the documents needed before work starts.

Location

Use the rules and authority for your address.

Scope

Describe each part of the proposed work.

Records

Keep decisions, conditions and completion documents.

Separate planning permission from permission to build

Start with the property address, building type and a clear description of the work. Planning controls concern matters such as use, location and effects on neighbours; building approval addresses construction requirements. The names, exemptions and decision-makers differ across Australia.

Victoria distinguishes planning and building permits; South Australia uses separate consents within development approval. Treat these as different checks, even when one professional helps coordinate them. Ask about heritage, hazards, easements, services and any owners corporation requirements for the site.

NSW: exempt development, CDC or development consent

  • Exempt development: Some minor work needs no planning or construction approval when it meets all applicable standards and land requirements. Read the exemption conditions before relying on this pathway.
  • Complying development certificate (CDC): Eligible proposals can be assessed against set standards by a council or certifier. This can include qualifying alterations, additions and two-storey housing; a second storey does not automatically rule it out.
  • Development application (DA): A proposal requiring development consent is assessed by the consent authority, usually council. Check the NSW residential pathways against the actual design and land.

A NSW construction certificate (CC) serves a different purpose from development consent. The Planning Portal states that a separate CC is not required for exempt or complying development. Confirm the certificates, conditions, appointments and notices needed before starting your work.

Do not assume CDC means no neighbour notification. NSW has notification requirements; ask the certifier which apply to the proposal.

Describe the work before asking if it is exempt

Questions for the relevant authority or building professional
Proposed workWhat to check
Kitchen or bathroomDescribe cabinetry, walls, waterproofing, plumbing and electrical changes separately. Confirm the building classification and any common property involved.
Deck, patio, carport or garageProvide dimensions, height, boundary distances, attachment to the house and site constraints. Check the actual local exemption or permit rules.
Extension or extra storeyAsk which planning pathway applies and what building, structural, drainage and energy documents are needed. Size or storey count alone is not a national approval test.
Heritage or strata propertyIdentify the relevant listing, conservation controls, by-laws and common property. Ask which additional permissions or specialist advice apply before finalising the design.

There is no single bathroom rule for Australia. For example, Queensland treats much existing-home kitchen and bathroom plumbing as notifiable work, while the NT permit table distinguishes wet-area changes in building control areas. Neither example decides the other approvals for your property.

Strata permission is another check: NSW distinguishes cosmetic, minor and major renovations, with waterproofing included in major work. Do not treat strata permission as planning or building approval.

Where to check in your state or territory

New South Wales

Check exempt, complying or development-consent eligibility, then the construction and commencement requirements for that pathway. Use the NSW residential approval guide and ask council or a certifier about your design.

Victoria

Ask council whether a planning permit is needed and a registered building surveyor whether a building permit is needed. Consumer Affairs Victoria explains the sequence and appointment rules. If both permits are required, obtain planning permission first; the builder cannot appoint a private building surveyor for you.

Queensland

Ask a licensed building certifier about building approval and the council about the planning scheme. Redland City Council explains the certifier role, including identifying possible planning, referral and plumbing approvals. Check your own council's requirements; plumbing has separate work categories.

Western Australia

Check development approval under the applicable planning controls separately from the building permit. WA Planning identifies local government as the first planning enquiry; the WA building-approval guidance directs applicants to the relevant local government for permit requirements.

South Australia

Identify the consents needed for the proposed development. PlanSA separates planning, building and land-division consent; the required combination depends on the proposal. Confirm that full development approval and any commencement requirements are in place before work begins.

Tasmania

Building Standards Tasmania distinguishes low-risk, notifiable and permit work. Notifiable work involves a building surveyor and notification rather than the same process as a council building permit. Check planning and plumbing separately; low-risk building work may still need planning approval.

Australian Capital Territory

Check development-approval and building-approval exemptions separately. ACT guidance requires the general and specific building-exemption criteria to be checked. Being exempt from one approval does not establish exemption from the other; ask about additional approvals for the land and services.

Northern Territory

Confirm whether the property is in a building control area. NT guidance explains which work needs building permits in those areas, including distinctions for wet-area work. A development permit or other permission may also be needed; check the proposal with the relevant authority and certifier.

Get fees and timing for the actual application

Request the current authority fee schedule and separate professional quotes. Clarify which plans, reports, lodgement charges, certification, inspections and completion documents are included. PlanSA provides application-fee information; use the equivalent current authority guidance for your location.

Ask for a sequence of stages rather than one promised approval date. PlanSA explains that timing depends on the pathway and completeness of the application, and some assessment clocks can pause for additional information. Distinguish document preparation, assessment, referrals or notification, conditions and permission to commence.

  • Who will lodge the application and respond to requests?
  • Which fees or reports are excluded from the quoted total?
  • What happens if the design changes, the application is refused or it is withdrawn?
  • Which approvals and conditions must be resolved before booking the construction start?

Keep a short approval record

  1. Confirm the property and scope. Gather the address, title or strata details, existing records and drawings showing proposed changes.
  2. Confirm the pathway. Ask the relevant authority and building professional which approvals, exemptions and other permissions apply. Keep their advice with the plans it concerns.
  3. Agree responsibilities. Record who prepares documents, lodges applications, pays fees and handles revisions. Check professional registration and insurance obligations for the work.
  4. Check permission to start. Keep the decision, approved plans and conditions together. Confirm required appointments, notices and inspections; do not assume a planning decision alone authorises construction.
  5. Keep completion records. Collect required inspection records, final or occupancy documents and trade certificates. Ask whether a proposed change needs amended approval before carrying it out.

Victoria's homeowner guidance explains contract responsibilities, the inspection role and completion documents. Use the equivalent requirements for your jurisdiction; certification does not replace checking that the contracted work is complete.

If work was done without the required approval

Contact the relevant authority and obtain suitably qualified advice before continuing, buying or selling on the assumption that the records can be fixed later. Establish what was approved, what was built and which records are missing. Ask your conveyancer about a property transaction and your insurer about cover.

Do not assume a retrospective DA or CC is available. NSW explains a different process for a building already erected without approval, involving a Building Information Certificate in relevant circumstances. Its scope is limited and an application is not a guarantee that the work can remain. Ask council what process applies to the actual site.

About the official sources

Official guidance linked above was checked on 16 October 2026. State and territory pages explain the system; a council source illustrates its own jurisdiction. Check current requirements with the authority responsible for your address before relying on an exemption or commencing work.

This guide does not approve a design, estimate fees or replace property-specific professional advice. Read our editorial policy for how sources and corrections are handled.

FAQ

Frequently Asked Questions

Clear answers to the questions homeowners usually ask before comparing quotes.

1

How much does a Development Application cost in Australia?

Ask the relevant authority for its current fees and obtain a separate quote for plans, reports, certification and inspections. The total depends on the proposal and location. This guide does not establish a typical national or state-wide price.
2

How long does council approval take for renovations?

Confirm the pathway, submission requirements, assessment stages and any notification or referral periods. Ask what can pause the assessment clock and what must happen after a decision. A statutory assessment period is not a promised date to start building.
3

Do I need council approval for a bathroom renovation?

The location, building type and exact work determine the answer. Check planning, building, plumbing and any strata requirements separately. Keeping the same room layout does not establish an exemption, and plumbing work does not automatically mean a NSW CDC is required.
4

What is the difference between DA and CDC approval?

In NSW, a DA seeks development consent through assessment of the proposal. A CDC is an alternative for eligible development meeting the applicable standards. Exempt development is a separate category. These NSW pathways are not a national permit system.
5

Can I start renovations while waiting for council approval?

Do not start work that needs an approval until that approval and the applicable commencement requirements are satisfied. Check any genuinely exempt work separately. An application receipt, planning consent alone or a contractor booking does not establish permission to start.
6

Is a private certifier cheaper or faster than council?

There is no general price or speed comparison established here. Ask who is authorised to assess the required approval and compare the same scope of fees, inspections and completion documents. Appointment rules differ; in Victoria the owner appoints the private building surveyor.
7

What renovations can I do without council approval?

Check the specific exemption rules for your property and proposed work. Minor work may be exempt from one approval but still need another permission, notification or licensed trade. Do not rely on a universal deck size, bathroom layout or project-value threshold.
8

When should I hire an architect or building designer?

Ask the approval authority what plans and specialist reports the proposal needs. Agree who will prepare them, lodge applications and answer requests for information. Choose appropriately registered professionals for the work; project value alone is not an approval or appointment rule.
9

What happens if I renovate without the required approval?

Get advice from the relevant authority and a suitably qualified adviser about the actual work and records. Do not assume an approval can be issued retrospectively or that paying a fee fixes the problem. The available process depends on the jurisdiction and circumstances.
10

Is building insurance required during renovations?

Check the relevant state or territory regulator for the insurance obligations applying to the work and contract. Ask your home insurer how the proposed work affects your cover. An approval, an ABN or a contractor quote does not establish that the required insurance is in place.
Explore finance

Need help financing your renovation?

Explore finance options with our partner Fundd. Tell us about your project and a representative will contact you to talk through your options.

Explore finance options

No obligation. Check options before you commit to a project.

Our finance partner

Fundd Finance

Fundd

Australian home improvement finance support.

Discuss your project
Understand the costs
Decide at your pace